dspConduct
Schedule a Post for a Specified Date and Time
A Role Processor with the Post role type can schedule a post to process at a date and time in the future.
Before a Role Processor can perform this task, a Designer must enable this feature at the role or scenario role level.
To schedule a post:
- Click dspConduct > Requests in the Navigation pane.
- Click the Roles icon for a request.
- Click the Tasks icon for the Post role.
- Click the Task ID.
- Click Edit.
- Click the Post Start Time field and select the date and time in the calendar.
- Click Save.
- Click Schedule Post.